FABRIFORM CONCRETE GROUTING FOR SLOPE REINFORCEMENT.
UNIFORM CROSS SECTION MATTRESS |
|
|
|
|
|
| PROTEX CO |
|
|
|
2015.5.27. |
|
|
|
| HARRY KOO |
|
|
|
|
|
|
|
|
| Case 1) PT-MTR |
|
|
|
|
|
|
|
| MANUAL TIE TYPE WITH 1.3MM
DIAMETER ROPE |
|
|
|
|
|
|
Mattress is woven in each layer separately and ropes are tied |
|
|
|
|
by hand by another rope. In this case adjusting |
|
|
|
|
|
distance between 2 layers are easy and so production is |
|
|
|
|
|
flexible for various distance and so MOQ is small. |
|
|
|
|
| MOQ :
10,000m2 |
|
|
|
|
|
|
|
| Average distance between 2layer after |
|
|
|
|
grouting will be 100mm, 150mm,200mm
| CASE 2) PT-WTR | | | |
| DOUBLE LAYER WOVEN TYPE WITH 1.3MM | |
| DIAMETER ROPE | | | |
| | | | |
| 2 layers are woven together and ropes are | |
|
inserted into both layer and when you grout | |
| mortar,inserted ropes are pulled out. | |
| So length of rope must be fixed before we | |
| start weaving and MOQ is bigger. | |
| MOQ : 20,000m2 | | | |
| Average distance between 2layer after | |
grouting will be 100mm, 150mm,200mm

| CASE 3) PT-WTY | | | | |
| DOUBLE LAYER WOVEN TYPE WITH YARNS | | |
| 2layers are woven together with yarns | | |
| inserted into both layer in weaving. | | |
So length of rope must be fixed before we
| start weaving and MOQ is bigger. | | |
| MOQ : 20,000m2 | | | | |
| Average distance between 2layer after | | |
grouting will be 100mm, 150mm,200mm
| | |
| | |
|
|
|
| | | | | |
 | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No comments:
Post a Comment